If you are seeing this message, then your Javascript is disabled. For better experience, kindly enable your Javascript.
Emmason
Integrated
Services
Search
Login
Sign Up
X
Home
Blog & News
Tutorial
Project Materials
Project Software
Seminar Materials
Bulk SMS
Scratch Cards
Name Dictionary
My Cart↓
View Cart
Verify Payment
History↓
Payment History
Download History
Settings↓
My Profile
Change Password
Delete Account
My Posts
Format:
Microsoft Word (.docx): Pages: 50+ pages: Chapters: 1-5
The full software or material containing all the chapters is available only when you make payment
Category: Project Material
REINFORCED CONCRETE DESIGN/ANALYSIS AND PREPARATION OF BENDING SCHEDULE/MATERIAL QUANTITY OF A TWO STOREY HOSPITAL BUILDING
ABSTRACT/DESCRIPTION
This project work is about the analysis and design of a two storey hospital building. A modern design Philosophy (The Limit Sate Approach) was used and reference wer made from B58110 and other design manual (Reinforced Concrete designs handbook by Reynoid and Steelman). It is of great importance to the structural engineer to design a two storey building to very highly creative standard that must be carried out responsibly in order to produce safe and durable structure. This is the general introduction of five chapters. Chapter one deals with the general introduction of the work, chapter two offers the literature review, chapter three provides the method of analysis and design and also production of design of different structural element, chapter four handles the bar bending schedule, materials quantity and bill of engineering measurement while chapter five deals with the summary, conclusion, recommendation and the limitation to the study. I check for deflection and punching in order to reassure that the structure were in order.
|
Other Topics From Your Department
1
EVALUATION OF RIVER SEDIMENT QUALITY USING DIFFERENT POLLUTION AGENTS
2
CONSTRUCTION OF A STEEL STOOL
3
EFFECT OF AGGREGATE GRADATION ON THE COMPRESSIVE STRENGTH OF CONCRETE
4
COMPARING THE COMPRESSIVE STRENGTH OF CONCRETE MADE WITH SAND AS FINE AGGREGATE AND WITH CHIPPING DUST AS FINE AGGREGATE
5
CONCRETE PAVEMENT INTERLOCKING TILES OF BACK OF CONCRETE LABORATORY
6
IMPACT OF CONCRETE TOWARDS PROCEDURE OF TIME PERFORMANCE OF CONSTRUCTION PROJECT
7
FACTORS INFLUENCING CONSTRUCTION PROJECT PERFORMANCE IN NIGERIA: A CASE STUDY OF WARRI, DELTA STATE
8
EVALUATION OF SEDIMENT OF OKPARA RIVER USING DIFFERENT POLLUTION AGENTS
Emmason Integratded Services(2017-2026)
All Rights Reserved
Designed and Maintained By Emmason Integrated Services
.