If you are seeing this message, then your Javascript is disabled. For better experience, kindly enable your Javascript.
Emmason
Integrated
Services
Search
Login
Sign Up
X
Home
Blog & News
Tutorial
Project Materials
Project Software
Seminar Materials
Bulk SMS
Scratch Cards
Name Dictionary
My Cart↓
View Cart
Verify Payment
History↓
Payment History
Download History
Settings↓
My Profile
Change Password
Delete Account
My Posts
Format:
Microsoft Word (.docx): Pages: 50+ pages: Chapters: 1-5
The full software or material containing all the chapters is available only when you make payment
Category: Project Material
IMPACT OF CONCRETE TOWARDS PROCEDURE OF TIME PERFORMANCE OF CONSTRUCTION PROJECT
ABSTRACT/DESCRIPTION
This study was carried out to identify the factors influencing the performance of construction projects in Delta state, Nigeria. A questionnaire survey was conducted and forty six (46) factors were identified, categorized into eight (8) groups, evaluated and ranked according to participants’ perspectives. Hundred (100) questionnaires were distributed as follows: 24 to clients, 36 to consultants and 40 to contractors. The outcome of these analyses showed that all the respondents agreed that construction projects were influenced by all the forty six factors indicated by the questionnaire. However, the analysis indicated that the top ten (10) factors that have the highest average index showed how these factors are affecting construction projects. Based on these findings, this study recommended that contractors’ progress payment should be made on time as well as minimizing change orders during construction to avoid delays. Also, consultants should give full commitment to monitor the project progress and ensure the work was according to specifications and satisfactory quality; meeting owner needs and expectation within the project budget and stipulated time. Finally, continuous coordination and relationship between project participants were required through the project life cycle in order to ensure project performance.
|
Other Topics From Your Department
1
REINFORCED CONCRETE STRUCTURAL ANALYSIS AND DESIGN OF A TWO STOREY RESIDENTIAL BUILDING
2
ENVIRONMENTAL IMPACT OF LEACHATE POLLUTION OF GROUND WATER SUPPLIES (A CASE STUDY OF OLOMORO LANDFILL SITES IN ISOKO NORTH L.G.A)
3
USE OF PLASTIC WASTES FOR SOIL STABILIZATION IN ROAD CONSTRUCTION (A CASE STUDY OF EMEDE RING ROAD)
4
EVALUATION OF RIVER SEDIMENT QUALITY USING DIFFERENT POLLUTION AGENTS
5
FACTORS INFLUENCING CONSTRUCTION PROJECT PERFORMANCE IN NIGERIA: A CASE STUDY OF WARRI, DELTA STATE
6
PROJECT MANAGEMENT ASSESSMENT OF NIGERIA(A CASE STUDY OF ABUJA HEAD AIRPORT EXPRESSWAY)
7
EXTENSION OF INSTRUMENTATION LABORATORY TO AN OFFICE
8
OPTIMUM COMPRESSIVE STRENGTH OF CONCRETE MADE FROM PARTIAL REPLACEMENT OF COASE AGGREGATE USING CASHED COW BONE
Emmason Integratded Services(2017-2026)
All Rights Reserved
Designed and Maintained By Emmason Integrated Services
.